All guides
Organizing & Views
Drag and drop
Drag tasks, events and notes between lists, boards, calendars and the sidebar, what each drop does, and reordering the sidebar.
Almost everything in Woday can be dragged. Drag a task, event or note card or row from any list, board, calendar, table or the rail, and drop it where you want it. A ring or tint shows what will receive the drop.
You can drag task, event and note rows and cards from any page and from the rail. In tables, use the grip that appears at the left edge of a row on hover, or drag the row itself.
Events synced from Apple Calendar or Google Calendar can’t be dragged.
What happens when you drop
A folder in the sidebar, on the Folders page, or a starred folder card on the Favorites page: A task: Filed in that folder. An event: Filed in that folder. A note: Filed in that folder
A tag in the sidebar: A task: Gets the tag (never removed). An event: Gets the tag. A note: Gets the tag
A saved view in the sidebar: A task: Gets the view’s folder, tags or star, so it appears in the view (see Views). An event: Same. A note: Same
The rail in a Folder scope: A task: Filed in that folder. An event: Filed in that folder. A note: Filed in that folder
The rail in a Tag scope: A task: Gets the tag. An event: Gets the tag. A note: Gets the tag
The rail in Inbox (or another list scope): A task: Due date cleared, so it’s back in the planning pile. Its folder is kept. An event: Nothing changes (events always have a date). A note: Date cleared
A day in the rail’s Calendar month grid, or the day list under it: A task: Moved to that day, keeping its time. An event: Moved to that day, keeping its time. A note: Placed on that day
The rail’s Today hour grid: A task: Scheduled at that time (snaps to 15 minutes). An event: Moved to that time, keeping its length. A note: Placed on that day
A day on the Today page, in Upcoming, in the Calendar, or a day section on the Events page: A task: Moved to that day. An event: Moved to that day. A note: Placed on that day
A column on the Tasks board: A task: Gets that column’s value: due day, Inbox (date cleared), Someday, Done, priority, note or status
Another task card or row: A task: Becomes its subtask. An event: Linked to the task. A note: Linked to the task
An event card: A task: Linked to the event. A note: Becomes the event’s note
A note card: A task: Added to the end of the note as a line, and linked. An event: Added to the end of the note as a line. A note: Added as a link line
A few deliberate limits:
Dropping onto a saved view never changes status, due date or priority. A drop won’t complete a task or change how important it is.
The Inbox drop leaves the folder alone on purpose, so you can send a filed task back for re-planning without losing its folder.
The Favorites sidebar section only reorders. Dropping items onto it doesn’t star them. Use Add to Favorites instead.
Reordering the sidebar
You can arrange folders and tags by hand:
Drag a folder (or tag) row up or down in its sidebar section.
An accent line shows where it will go. Release to drop it there.
The order is used in the sidebar, on the Folders and Tags pages, and in the rail’s Folder and Tag menus. It syncs to your other devices.
Pinning: the sidebar shows the first five folders and tags. To keep one always visible, drag it into the top five. New folders and tags appear at the top.
The Favorites section reorders the same way (that order stays on this Mac). Saved views in the sidebar are not reordered by dragging.
You can also choose which sidebar sections show, and in what order, in Settings ▸ Appearance. Use ↑ and ↓ to move a section and the switch to hide it. The same settings page controls which pages appear in the sidebar menu. The Folders, Tags and Views pages are hidden from the menu by default, but the sections’ View all links and search still reach them.
Still need help?
Email soltwagner@gmail.com and you’ll hear back from the developer directly.